Latest updates:

  • Goulburn River Hybrid DC coupled BESS with 2 DUIDs – 480 MW / 960MWh – Transgrid connection with PE inverters/PPC
    R0 studies completed and 5.3.4A approval received
  • Maison Dieu Hybrid Solar + BESS – 60 MW / 80MWh – Ausgrid connection with Ingeteam inverters/PPC
    R0 studies completed and 5.3.4A approval received
  • Ararat Syncon – 250MVA – VicGrid connection with Andritz Syncon AVR
    R1 studies, Registration and HP testing completed. In commercial operation
  • Buronga Syncon – 2x 125MVA – AUSGRID connection with Andritz Syncon AVR
    R1 studies, Registration and HP testing completed. In commercial operation
  • West Wyalong Solar Farm – 90MW – Essential Energy connection with PE inverter/PPC
    R1 studies, Registration and HP testing completed. In commercial operation